Our project
29/01/2018
Package P-1 (B): Leveling and Backfill of the northern area; sand grading 1,2 million m3 and 2,...
29/01/2018
After LICOGI13IMC is authorized by LICOGI13 in execution and completion of Thang Long II Industrial...
28/04/2019
Thang Long Industrial Park III in Vinh Phuc province is commenced in September, 2017 with total...
02/01/2018
Package A5: Noi Bai - Lao Cai expressway is a package of Noi Bai - Lao Cai expressway project, The...
02/01/2018
On June 22, 2010 in Yen Bai province, LICOGI13-IMC signed Construction contract for Package Section...
02/01/2018
Renewing traffic road in the countryside with its Length 4,173 Km, water drainage system and the...
29/01/2018
On September 14th, 2011, Nishimatsu Construction Co., Ltd- the enterprise wiith 100% foreign...
13/03/2019
Organic soil excavation, normal soil excavation, stone excavation, soil backfill for road base,...
29/01/2018
Nam Ga- Ha Long New Urban Area Project is approved in compliance with Decision No. 772/QĐ-UN on...
29/01/2018
Leveling with 165.000m3 of sand and construction of road arrangement with 8.500m3 quantity
29/01/2018
Construction location: in airport line, 1km from freight station, 3km from Quang Minh IP, 10km from...