Monday, January 29, 2018
- Location: Hai Boi commune, Dong Anh district, Hanoi city
- Owner: Thang Long Industrial Park Corporation
- Period: 2005-2006
Overview:
Phase 1:
Leveling with 165.000m3 of sand and construction of road arrangement with 8.500m3 quantity
Period: 1998 - 2000
Contract value: 7.573.000.000 VND
Phase 2:
Total area 72ha, Construction of all traffic road system, Transformer station, Power station, Rain water drainage, sewage pumping station, Standing House
Contract value: 29.800.000.000 VND