Mineral Mining and Processing at Nui Phao mountain project Phase 1 & Phase 2- Thai Nguyen province

Friday, January 29, 2016

 

 

 

- Location: Ha Thuong commune, Dai Tu district, Thai Nguyen province

- Owner: Nui Phao Mineral Mining and Processing Co., Ltd (MASAN RESOURCES)

*** Phase 1:

- Contract value: VND 63,000,000,000 

- Period: 2011-2013

- Scope of work:  Infrastructure work for TSF area and Crushing area- Phase 1

*** Phase 2:

Contract value: VND 100,084,000,000

Period: 2013-2014

- Scope of work:  Infrastructure work for TSF area and Crushing area- Phase 2

 Overview:

Nui Phao is one of the largest mineral mining projects in the country. Total mining deposit is more than 83 million tons of ores in 30 years. The main products of Nui Phao mountain are Vonfram, Fluorit, Bismut and its accompanying products such as gold and copper. Scope of work includes mainly soil excavation, backfill and transportation; peeling topsoil, soil backfill for 4 main dikes stopping water to make the  tailing stock yard, build diversion canal, leveling and backfill for the grinding and screening area 7ha

 The items executed by LICOGI13IMC:

+ The soil grading area with main quantities 160.000m3 + the auxiliary dam 1A for the sulfurets tailing stockyard with about 107 million m3; Spillway and sumps at the arsenic ore stock yard and other work.