Construction of tour and service residential area for Lai Nghi Hung bridge Package No.5: Rain water drainage, sewage drainage; Package No.8: Construction of pavement, slab, tree planting, traffic organization

Monday, January 29, 2018

- Location: Dien Nam Dong commune, Dien Ban district, Quang Nam province

- Employer: Sai Gon Thanh Dat Agricultural Investment JSC

- Contract value: 25.213.480.000 VND

- Construction period:  2017-2018

Overview:

Hoi An Green Village is built in 109ha, designed in compliance with style of shophouse, resting villa with adequate high-class facilities. There are high-class facilities for resting: trade center, Home lake building, Lai Nghi market, Green park, Healthcare center, completion technical infrastructure…brings residents with comfortable life.

The items executed by LICOGI13 IMC:

-          Package No.5: Construction of rain water and sewage drainage system

-          Rain water drainage: Box culvert Line No.10 from Manhole DK8 to Manhole CX2, all circular sewer and sewer manhole Line no.10, all lines no.11, 12, 13, 3A, 3B, Line no.1 from intersection D10 to D11, Line no.2 from intersection D21 to intersection D24

-          Sewage drainage: manhole, ditch, pavement along rainwater drainage lines, manhole, water drainage ditches behind building lot B1-19, B1-20, B1-18, B4-02

-          The whole package No.6: water supply system, fire fighting system

-          The whole package No.8: construction of pavement, curb, tree pits and traffic plan.