Monday, January 29, 2018
Location: Hong Ha ward, Hong Hai district, Ha Long city.
Owner: Ha Long Project Management Board
Contract value: 24.691.042.000
Period: 2003
Overview:
Lan Be sea contour line - Column 8 - Package 3B.1 including: Excavating road frame, compacting slab close to foundation bottom at grade K98 with 30cm thickness, 2 foundation layers with crushed-stone aggregate, 2 revetment layers (coarse grain and fine grain asphalt concrete), water drainage system along road, block tiles for pavement, curb, rubble for building jetty, road painting. The main road line is 2.788,7m long from Km 2 + 475,73 to Km 5 + 264,43. Auxiliary road line No.2. Connecting from Road 18 to the intersection with the sea boundary at Km 2 + 484,19.